Aluminum Boat application – Painted Aluminum
Print Application
Equipment
- 2 stipple roller sleeves per gallon (Included with purchase of textured gallon) or short nap roller, like a 3/16” mohair or similar for a smooth application.
- 80 grit Sandpaper
- Xylene (Xylol) OR Solvide (in CA or UT)
- Stir stick or electric paint mixer
- Roller Tray
- Cloth or sturdy cotton rag
- Paint Gloves
- Household non-chlorinated detergent, like Spic n Span
- 3M Blue tape (Optional)
- Paint Respirator (Optional)
Surface Prep
- Clean the surface thoroughly, with a non-chlorinated household detergent
- Rough up the surface with 80 grit sandpaper
- Wipe down the surface with Solvide or xylene on a cloth and once completely dry, apply the Durabak.]
- IF you scuff the surface all the way down to bare aluminum you will need to scuff bare aluminum 40 grit and spot prime it with Zinc Phosphate - DO NOT USE Xylene on bare Aluminum - wait 24 hrs between prime and Durabak application
Application Process
- Do not open can until surface is prepped and ready to go.
- Then open can and stir well.
- Pour a portion into a roller tray and begin application.
- Roll on first coat using Durabak stipple roller sleeve.
- Use a paint brush in corners and hard to reach areas.
- Stir occasionally while working with the product.
- Keep lid on can while not in use.
Coverage
1 gallon of smooth Durabak covers roughly 75-80 square feet in our standard 2 coat application.
1 gallon of textured Durabak covers approximately 60 square feet in our standard 2 coat application.
Good to Know
- Durabak begins to cure with exposure to air, so minimize exposure to air while working with it.
- The consistency of the Durabak should be runny, as it’s self leveling. If it’s thicker, you can add up to 15% xylene to thin it. It should be mixable after adding the xylene and back to a runny form. If it’s pasty and thick, DO NOT APPLY, rather reach out to us for assistance.
- You will have a few hours of work time once the can is opened (3 to 5 hours normally).
- A second coat can be applied using a stipple roller sleeve after 1-2 hours, once the first coat is touch dry.
- After second coat is applied allow 24 hours before walking on it. Complete cure is about 5 or 6 days, so no heavy use until then.
-
When applying Durabak it is important to ensure that each coat does not get too thick. If Durabak is applied in a coat that is too heavy it will trap the curing gasses and leave pinholes which will eventually lead to discoloration in the Durabak.
-
Be sure to apply moderately thin coats of the Durabak and as a guide you should be getting coverage similar to what is laid out above.
Additional Tips
- Temp should ideally be 60 degrees or above for the application, and above 40% humidity.
- Xylene should be applied immediately to clean up any misapplied Durabak.
- If taping off, use 3M Blue tape and remove immediately after second coat is applied.